Sign In | Join Free | My spintoband.com
China Bangying (Suzhou) Technology Co.,Ltd. logo
Bangying (Suzhou) Technology Co.,Ltd.
Bangying (Suzhou) Technology Co.,Ltd.
Active Member

2 Years

Home > Others Carbon Steel Products >

Customized Galvanized Tube for Construction Schedule 40 Galvanized Steel Pipe BY

Bangying (Suzhou) Technology Co.,Ltd.
Contact Now

Customized Galvanized Tube for Construction Schedule 40 Galvanized Steel Pipe BY

Customized Galvanized Tube for Construction Schedule 40 Galvanized Steel Pipe BY

Product Description Galvanized Steel Pipe for Scaffolding and Construction/Galvanized Steel Pipe Outer diameter 12-114mm Thickness 0.4 mm to 2.0mm Length 2m to 12m or as per your request Zinc coating ...

Product Tags:

2.0mm galvanized steel pipe

      

2.0mm steel coil galvanized

      

q235b galvanized steel pipe

      
Send your message to this supplier
 
*From:
*To: Bangying (Suzhou) Technology Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)